Alaska Railroad part of effort seeking $100 million in federal funds to build spur

Circular Alaska Railroad logo

ANCHORAGE, Alaska — The Alaska Railroad is joining in an effort to acquire $100 million in federal infrastructure funding to build a new 18-mile spur to serve a liquefied natural gas plant near Anchorage. The Mat-Su Valley Frontiersman reports the Matanuska Susitna Borough, Fairbanks North Star Borough, and Interior Gas Utility are also part of […]

Read More…

Surfliner, Metrolink service to resume in south Orange County

Heavy equipment moving rocks along rail lline at beach as train waits in distance

LOS ANGELES — Metrolink commuter rail service in south Orange County, and Amtrak Pacific Surfliner operations between LA and San Diego, were scheduled to resume this morning (Monday, Oct. 4) following the conclusion of emergency repairs to tracks near San Clemente, Calif. Service was halted Sept. 16 after a landslide pushed the rail line out […]

Read More…

BNSF Northern Transcon reopens after Empire Builder derailment

BNSF Railway logo

JOPLIN, Mont. — BNSF Railway’s busy Hi Line Subdivision is open again following the derailment of Amtrak’s Empire Builder over the weekend. According to KHQ News, a local NBC affiliate, the first BNSF freight train to pass through the community of Joplin, Montana, since Saturday’s derailment arrived just after 4 a.m. Tuesday. The train is […]

Read More…

Feds: ‘Empire Builder’ was traveling under speed limit at time of crash

Three men in hard hats and safety vests in front of derailed passenger train

JOPLIN, Mont. — The vice chair of the National Transportation Safety Board says Amtrak’s Empire Builder was traveling below its posted speed limit when it derailed and partially overturned over the weekend in rural Montana, killing three people. NTSB Vice Chairman Bruce Landsberg told members of the media Monday afternoon that the eastbound Empire Builder […]

Read More…

‘City of New Orleans’ returns to its namesake city

Bilevel passenger train on concrete trestle with construction crane behind it

NEW ORLEANS — After first being turned back to Chicago at Memphis, Tenn., and later at Jackson, Miss., Amtrak’s City of New Orleans will finally make its grand entrance to the Crescent City one month after Hurricane Ida slammed into Louisiana with torrential rains and strong winds. The southbound train departing Chicago today and its […]

Read More…

Buckingham Branch petitions to acquire line leased from CSX

Buckingham Branch Railroad logo

WASHINGTON — Virginia’s Buckingham Branch Railroad seeks to acquire a line that it presently leases from CSX Transportation. It encompasses 164.22 miles of line from milepost 276 in Clifton Forge to milepost 111.78 at Doswell. The railroad has leased the line, part of which hosts Amtrak’s Cardinal, since 2005. It was originally Chesapeake & Ohio. […]

Read More…

California High-Speed Rail Authority seeks permission for route changes

California High Speed Rail Authority logo

WASHINGTON — The California High-Speed Rail Authority has filed two petitions with the Surface Transportation Board to reopen proceedings to make changes to two aspects of its high speed rail line under construction in the Central Valley. The first document seeks to reexamine an exemption granted for 65 miles of high-speed line between Merced and […]

Read More…

St. Louis TRRA Merchants Bridge project reaches major milestone

Red crane hovers over bridge truses in front of St. Louis Arch

ST. LOUIS, Mo. — The Terminal Railroad Association of St. Louis Railroad reached a major milestone on Friday when the first of three replacement spans on the Merchants Bridge was floated into position on the Mississippi River at St. Louis. Owned by the Terminal Railroad Association of St. Louis, the Merchants Bridge project is a […]

Read More…

Emergency repairs halt Surfliner, Metrolink service in south Orange County, Calif.

Blue and silver locomotive and passenger train at platform in front of skyscrapers

LOS ANGELES — Amtrak and Metrolink service has been suspended in south Orange County for emergency track work to stabilize right-of-way in the San Clemente, Calif., area. The Pacific Surfliner website says no trains will operate south of Irvine. Calif., between today and Sunday. As of Monday, Sept. 20, train service will resume on a […]

Read More…

Brightline, FEC activate first new double-track segment this week

Red-and-yellow locomotives with fuel tender cross street

WEST PALM BEACH, Fla. — It’s only 13 miles of a 129-mile project, but this week’s planned activation of a second main track between West Palm Beach and Jupiter, Fla., represents tangible progress in Brightline’s northward expansion. Restoration of the second main on Florida East Coast’s line to Cocoa, Fla., helps establish a fluid, 110-mph-capable […]

Read More…

News photo: BNSF makes progress on second Sandpoint bridge

Train crossing bridge next to another bridge under construction

Much progress has been made on BNSF’s second bridge across Lake Pend Oreille outside Sandpoint, Idaho. Rolling through on the existing 4,769-foot bridge (completed by Northern Pacific in 1904) on Sept. 5th is train H-BARPAS, a Barstow, Calif., to Pasco, Wash., manifest that detoured via Denver due to wildfire damage on BNSF’s route in northern […]

Read More…

Government report questions Army’s preparedness for rail moves in major mobilization

Military equipment on flatcars crossing river

WASHINGTON — The U.S. Army needs to act to ensure it is able to move equipment by rail in case of a large-scale mobilization, the Government Accountability Office says in a report issued earlier this month, and also needs to address widespread track issues with Army-controlled rail lines. A summary of the report is here, […]

Read More…