How To N Scale Insight Roadbed for main lines and spurs

Roadbed for main lines and spurs

By Jim Kelly | August 24, 2023

| Last updated on August 25, 2023

There's more than one way to differentiate between mainline and adjacent spurs

Email Newsletter

Get the newest photos, videos, stories, and more from Trains.com brands. Sign-up for email today!

Roadbed for main lines and spurs: Lots of modelers in all scales take measures to differentiate mainline track from spurs and sidings. Spurs are dead-end tracks leading to industries, loading ramps, and sometimes stations. Sidings are tracks usually parallel to mainline tracks and are double-ended so a train can take the siding, stop, and wait for another train to pass it.
A model railroad layout with multiple lines of track and two trains
The insulated boxcar serving Jim Kelly’s Giumurra Winery is on track mounted to 1⁄16″ thick roadbed, while the locomotive is on mainline track laid on 1⁄8″-thick Midwest Products N scale cork roadbed. Differentiating between main line and secondary trackage helps operators determine where they are and looks prototypical, too. Roen Kelly photo

One way to differentiate tracks is by ballast color, say using a light gray for the main line and a darker gray or brown for the sidings and spurs. I think this is an excellent idea, as in towns and yards it can be difficult to distinguish between tracks, and it’ll help your operators to recognize the main.

The one problem I have with this idea is that while the Woodland Scenics fine gray ballast I use looks correct for my Southern Pacific prototype, I don’t favor the look of any of the tan, buff, and brown I’ve used on the spurs. I airbrush them with Earth to weather them, and then I think they look pretty good.

Sidings on modern lines

The SP’s route up Tehachapi Pass is a vital link on a heavily trafficked transcontinental railroad. The company would’ve double-tracked it if the terrain hadn’t been so challenging that the cost would’ve been prohibitive. Therefore, the line is single-tracked with frequent and long passing sidings built to the same high standards as the main. I think you’ll find the situation the same on most modern heavily trafficked main lines.

Spurs are a different story, depending on how old they are and the types of customers they serve. Before the 1970s, railroads had many more branches and far more small customers that shipped or received a few cars a day or less. Spurs were often built of lighter rail, received less maintenance, and didn’t generate much revenue. Much as they might want to, the railroads couldn’t drop these customers or increase their rates without approval from the Interstate Commerce Commission.

That changed with deregulatory actions in the 1970s. Many money-losing branches were abandoned, which in some cases led to them being taken over by shortline railroads. (And some became bike paths, making your author quite happy.)

Today, most railroad customers are large and ship and receive many cars a day. Examples are western coal or petroleum producers, steel mills, auto plants, power plants, and a host of others. These large modern facilities need dependable, high-volume trackwork that’s basically built to mainline standards.

Laying spur tracks

To differentiate them from the main line, I laid my spurs on shallower roadbed. The cork roadbed I used for mains is 1⁄8″ high. Half that height is 1⁄16″, and so I searched for cork that thick. I found such cork in rolled sheets at Michael’s craft stores and cut it into 7⁄8″ strips for roadbed, using scissors. For turnout roadbed, I traced around the actual turnout and cut out the shape. Where I needed to curve the cork, I cut kerfs halfway across and spaced about 1⁄2″ apart so the strip would bend. (You could also just cut a curved piece from your cork sheet.)

The craft store cork worked OK, but I’ve found something better since: head gasket cork, which I bought at an auto parts store. The craft store cork tore easily, but this gasket cork is tough stuff indeed. It’s made of a thin strip of rubber sandwiched between two thin layers of cork.

Was it worth it?

I’d like to end on a triumphant note, but when I look at the spurs adjacent to the mainline tracks, I find it hard to see the height difference. Also, as some of my friends can attest, sanding the transition from the 1⁄8″ mainline cork to the 1⁄16″ spur cork is no easy matter.

Another way to emphasize differences between main lines and spurs is with smaller rail size track. On my layout I used Atlas code 55 throughout, so I could’ve used code 40 on spurs and maybe achieved a more dramatic result. Also, I could’ve just cemented the spur track directly to the sub-roadbed. If I were to do it again I’d experiment first, so I’ll leave you with that suggestion.

This article originally appeared in the September 2018 issue of Model Railroader – Ed. 

6 thoughts on “Roadbed for main lines and spurs

  1. In a sense, modern larger railroads don’t have sidings. Rather,these are simply sections of high-grade double track signalled in both directions.

  2. I found gasket material in rolls in cork & fiber at my local Fleet Farm.
    It comes in 9″ & 15″ roll widths.
    It was found in the Auto Parts Department.

  3. Regarding the ballast. The railroads to add a siding for a customer only added the track turnout. The installation and maintenance of the siding was the responsibility of the customer/property owner. That was done usually by a local railroad contractor using locally supplied materials. So while the railroad’s ballast would come from an online quarry usually railroad owned, the siding ballast would come from a local quarry. That is why today you can find abandoned siding still in place with the track turnout removed, but the rest of rail in place. The are instances where the railroad is the property owner and does provide the siding, as part of the lease.

  4. John, I’ve had good success with Atlas code 55 turnouts. Two things I’ve learned is not to force them when laying track. If the straight leg wants to curve a little let it. Also allow for a couple of inches of straight when entering a turnout from a curve. Also your locomotive drivers must be perfectly in gauge, as clearances are tight (and more realistic) per NMRA standards.

  5. Great article Jim. One correction however. If a modeler asks for “head gasket cork” at an auto parts store, the counter person will either snicker or look very confused as no such material exists. Typically constructed of steel in multiple layers, a head gasket is required to seal combustion pressures and resides between a cylinder head and engine block. Ask for cork gasket material instead.

  6. Jim, thanks for your perspective regarding how to differentiate spurs and sidings from the mainline. You mentioned that you used Atlas code 55 track for your layout. I am interested in your perspective on how the Atlas turnouts are holding up. Are they reliable? Do you encounter any significant maintenance issues? Do you perform any kind of modifications to the turnouts (add jumper wires, etc.) prior to installation? I would appreciate any information you could provide. Regards.

You must login to submit a comment