BNSF line in California closed by washout

BNSF Railway logo

WASCO, Calif. — BNSF’s main line on the Bakersfield Subdivision in the San Joaquin Valley has been closed by a washout, the railroad informed customers in an advisory on Saturday. The washout was reported about 1:30 p.m. PST near Wasco, about 27 miles northwest of Bakersfield. BNSF’s initial estimate to reopen the route between Bakersfield […]

Read More…

MBTA lifts blanket speed restriction, but many slow orders remain

A streetcar

BOSTON — Blanket 25-mph speed restrictions remain in place on the Massachusetts Bay Transportation Authority Green Line and Mattapan Trolley Line, but have been lifted on the Red, Orange, and Blue lines, following a Thursday night announcement of the systemwide slow order. The Boston Globe reports the overall restriction was lifted by 10:30 a.m. today […]

Read More…

Amtrak set to start early work on B&P Tunnel project

Map detail showing MARC commuter stations around B&P Tunnel

BALTIMORE — Amtrak will begin early construction activity on the B&P Tunnel Replacement Program this Friday, March 10, with tie and rail replacement and track drainage work as part of its preparations for the $6 billion project. “This initial project will directly reduce impacts during later construction phases and maximize the benefits of the new […]

Read More…

Adventures in code 55 track

Adventures in code 55 track

Adventures in code 55 track: I’m now building my fourth layout featuring the Tehachapi Loop, so I call it Tehachapi IV. I’d used Peco code 55 track on Tehachapi III, and liked it very much, so I was planning to use it again. Then I saw Atlas’s new code 55 flextrack and was smitten. The […]

Read More…

Wheel bearing expert: To prevent derailments, railroads should equip freight cars with sensors

Hot box and dragging equipment detector.

Installing sensors on freight cars is the only way to prevent another disastrous derailment like the Feb. 3 Norfolk Southern hazardous materials wreck in East Palestine, Ohio, a wheel bearing expert says. Constantine Tarawneh, a mechanical engineering professor who heads the University Transportation Center for Railway Safety at the University of Texas Rio Grande Valley, […]

Read More…

Norfolk Southern taking steps to improve wayside detector network

Black cloud of smoke above town

Norfolk Southern will take several steps to improve its wayside defect detector network in the wake of the National Transportation Safety Board preliminary report on last month’s disastrous derailment in East Palestine, Ohio. NTSB officials say the Feb. 3 wreck of train 32N was likely caused by the catastrophic failure of a wheel bearing on […]

Read More…

Erosion concerns halt Cuyahoga Valley Scenic operations

Yellow, maroon, and black FA locomotive with passenger train

PENINSULA, Ohio — The Cuyahoga Valley Scenic Railroad, which had planned to resume full operations on Friday, March 3, instead has had to suspend all operations as of that date. A news release on the heritage railroad’s website says “ongoing geotechnical soil monitoring in recent weeks identified increasing erosion along the 26-mile scenic and educational […]

Read More…

Transport Canada to fund 20 rail projects addressing climate change

Transport Canada logo

OTTAWA — Transport Canada will provide up to C$5.4 million in funding for 20 projects nationwide under the Rail Climate Change Adaption Program, which seeks to better prepare railroads for dealing with conditions such as flooding, fires, and more extreme operating temperatures. The program supports research, development, and deployment of innovative technologies, tools, and approaches […]

Read More…

MBTA launches ‘safety dashboard,’ releases information on track speed restrictions

Workmen repair track

BOSTON — The Massachusetts Bay Transportation Authority on Friday introduced an “online safety dashboard,” allowing the public to track the agency’s progress in responding to Federal Transit Administration safety directives, as well as providing information on speed restrictions across the MBTA’s rail transit system. The dashboard, available here, shows that as of Feb. 12, the […]

Read More…

SEPTA approves contract for final design of King of Prussia Rail

Map of rail line into King of Prussia, Pa.

PHILADELPHIA — The Southeastern Pennsylvania Transportation Authority has awarded a $125 million contract for the final design phase of the King of Prussia Rail project. SEPTA awarded the contract to HNTB Corp. at its Feb. 23 board meeting. The project will add a 4-mile, five-station spur to the Norristown High Speed Line near its northern […]

Read More…

Basic parts of a gauge-1 switch

illustrations of two turnouts

Basic parts of a gauge-1 switch: Switches are necessary any time one wants to send a train in an alternate direction. They’re what makes it possible to store one train on a siding and run another around it, or any other basic operation. They’re essential if you want your trains to do more than just […]

Read More…