Now that the car float, float bridge, and railroad lift bridge are in place on MR’s Rice Harbor layout, Cody Grivno can add the two-part resin to the waterways. But before adding water, Cody first demonstrates how to paint the harbor bottom and prep the area for the pour.
Rice Harbor Series: Model a harbor part 1 – paint and prep
See this interesting small layout being built.