Olympia Logging Series: Part 8 – installing cork roadbed

David Popp laying cork roadbed.

Installing cork roadbed is the first step to laying reliable trackwork on MRVP’s On30 Olympia Logging Co. display-style layout. In this video, David shows you basic techniques for preparing, cutting, fitting, and securing the HO scale roadbed along the main line, sidings, and on the sector plate. Plus, David also demonstrates how one specific product […]

Read More…

Olympia Logging Series: Part 9 – laying track

Having trouble viewing this video?   Please visit our Video FAQ page All the prep work is done, so now David can get down to the task of installing flexible On30 track and turnouts on MRVP’s Olympia Logging Co. layout. David demonstrates all of the essential tracklaying steps, including how to cut and trim the […]

Read More…

Olympia Logging Series: Part 8 – installing cork roadbed

David Popp laying cork roadbed.

Installing cork roadbed is the first step to laying reliable trackwork on MRVP’s On30 Olympia Logging Co. display-style layout. In this video, David shows you basic techniques for preparing, cutting, fitting, and securing the HO scale roadbed along the main line, sidings, and on the sector plate. Plus, David also demonstrates how one specific product […]

Read More…

Working on the railroad

Norfolk Southern train 19G, westbound at Lebanon, Pa., is led by SD70s Nos. 2539 and 2557 on Jan. 9, 2014. The track gang is installing new welded rail on both tracks of a 3-mile section of the double-track NS Harrisburg Line through this south-central Pennsylvania city. Photo by Mark W. Hoffman […]

Read More…

Thin Branch Series: Buried track

Buried track

Having trouble viewing this video?   Please visit our Video FAQ page David uses our HO scale Thin Branch project layout to show you a simple technique for modeling an industrial track laid into gravel or dirt, which makes it easy for vehicles to drive over the rails. […]

Read More…

Thin Branch Series: Buried track

Buried track

Having trouble viewing this video?   Please visit our Video FAQ page David uses our HO scale Thin Branch project layout to show you a simple technique for modeling an industrial track laid into gravel or dirt, which makes it easy for vehicles to drive over the rails. […]

Read More…

Flying high

A southbound grain train flies through Sidney, Ohio, on an elevated right-of-way built by predecessor Baltimore & Ohio, on May 10, 2012. The train is crossing Ohio Route 47 on the west side of downtown. Photo by Brian Schmidt […]

Read More…

Video Step by Step: Replacing turnouts

Cody Grivno working on the rails.

Having trouble viewing this video?   Please visit our Video FAQ page Sometimes you need to replace a turnout or other trackwork on your model railroad. In this video Cody Grivno shares his technique for replacing turnouts on Model Railroader’s HO scale MR&T layout, walking you through the project from cutting out the old rails […]

Read More…

Video Step by Step: Replacing turnouts

Cody Grivno working on the rails.

Having trouble viewing this video?   Please visit our Video FAQ page Sometimes you need to replace a turnout or other trackwork on your model railroad. In this video Cody Grivno shares his technique for replacing turnouts on Model Railroader’s HO scale MR&T layout, walking you through the project from cutting out the old rails […]

Read More…