Modeling Series Layout Builds Hills Line The Hills Line with James McNab | Adventures in tracklaying, Episode 15

The Hills Line with James McNab | Adventures in tracklaying, Episode 15

By James McNab | September 28, 2023

Innovative model railroading techniques unveiled on the Hills Line

Email Newsletter

Get the newest photos, videos, stories, and more from Trains.com brands. Sign-up for email today!

In this episode, Host James McNab embarks on a journey to elevate model railroading skills by exploring cutting-edge methods. Specifically featuring the use of Central Valley tie strips to build hand laid trackwork. With the objective of encouraging modelers to employ fresh techniques, James demonstrates the process on his portable HO scale Hills Line module, emphasizing the significance of continuous growth and the pursuit of excellence in the hobby.

2 thoughts on “The Hills Line with James McNab | Adventures in tracklaying, Episode 15

  1. Interesting. When these tie strips were introduced, I bought a few and laid two three foot samples of track on a length of Homasote, one using the CV ties with my standard ME code 70 rail and the second laying that same rail size on a length of stained wood ties per my normal track construction. Wood tie rail was spiked every fifth tie. I also spiked every fifth on the CV ties rather than glue the rail, since I didn’t trust any glues available then. Ballasted both and then evaluated the look for each technique. My conclusion – For my layout I preferred the look of wood ties despite having no tie plates. With today’s glues and much individual tie painting, I would seriously consider the CV ties in any new layout. Looking forward to rail attachment and switch building in following episodes.

You must login to submit a comment