Having trouble viewing this video? Please visit our
Video FAQ page
All the prep work is done, so now David can get down to the task of installing flexible On30 track and turnouts on MRVP’s Olympia Logging Co. layout. David demonstrates all of the essential tracklaying steps, including how to cut and trim the rails, remove and adjust the ties, install feeder wires, and secure the trackwork to the roadbed. He also shows how to install our insulated turnouts to accommodate under-layout actuators. As always, you’ll be sure to pick up other helpful tips along the way too!
Video still comes up as unavailable, private.
Video unavailable, video is private
Hi, Laura — I’ve sent a message to the appropriate individual on the video staff, but he’s apparently at a medical appointment right now. We’ll address this as soon as possible. — David Lassen, Trains Magazine