Work begins to replace Metro-North’s Park Avenue Viaduct

Electric multiple-unit trains meet with New York City skyline in background

NEW YORK — Work has begun on rebuilding of the Park Avenue Viaduct, the 130-year-old elevated route to Grand Central Terminal and Harlem-125th Street Station that is used by 98% of Metro-North Railroad trains — a project Metro-North President Catherine Rinaldi pointed to as the most important state-of-good repair project faced by the Metropolitan Transportation […]

Read More…

Green Line extension could see two weeks of night closures to repair track-gauge issues

Man in bucket-lift truck working on sound wall

BOSTON — The contractor responsible for out-of-gauge construction on the Massachusetts Bay Transportation Authority’s Green Line extension is proposing a series of overnight shutdowns to rectify the problem, WBZ-TV reports. MBTA CEO Phillip Eng told a meeting of the agency’s advisory board that the contractor is proposing a shutdown of the 4.7-mile extension from 9 […]

Read More…

Mudslide disrupts Metro-North, Amtrak operations along Hudson River

Aerial view of mudslide from just behind large house onto railroad tracks.

NEW YORK — A mudslide on Metro-North’s Hudson Line has disrupted Metro-North service and halted Amtrak operations between New York City and Albany, N.Y. The Metropolitan Transportation Authority says the slide occurred this morning (Saturday, Oct. 21) in the village of Briarcliff Manor, blocking all four tracks at the slide site. Metro-North is currently offering […]

Read More…

Caltrain effort to shore up bridge stalled by permitting

Aerial view of bridge surrounded by trees

MENLO PARK, Calif. — Efforts by Caltrain to shore up a bridge on the commuter rail line threatened by erosion along a creek have been stalled by the complex gauntlet of governmental agencies that must approve the work, meaning repairs will not occur before another rainy season arrives with the potential of further erosion that […]

Read More…

MBTA Green Line extension was built with track out of gauge, faces significant repairs

Green and white light rail vehicle at station

BOSTON — Tracks were built out of gauge on the Massachusetts Bay Transportation Authority’s Green Line extension, meaning the 4.7-mile, $2.3 billion project faces significant rebuilding less than a year after it opened. MBTA CEO Phillip Eng revealed the problem at a press conference today (Thursday, Oct. 19). An MBTA spokesman said 80% of the […]

Read More…

CREATE partners outline bid for Mega Grant to advance 75th Street project

Map of complex group of rail lines in South Chicago

CHICAGO — It’s a measure of how large CREATE’s 75th Street Corridor Improvement Project is that, even having been divided into more manageable parts, it’s still too big, from a financial standpoint, for one of those parts to be fully funded through the federal government’s Mega Grant program. So, when CREATE — the Chicago Region […]

Read More…

Maxon Railway is an office on rails

A two-story office structure made of glass and unpainted steel sheets sits on a wide-gauge track

As the Maxon Railway car pulls away from the platform everything seems business as usual. Steel rails. Steel wheels. A slight clickety-clack. The whizzing soundtrack of an electrified locomotive. Check. Check. Check. Check.  Except this is no ordinary rail car and this railway is definitely nowhere near ordinary. Located in the Pacific Northwest with the […]

Read More…

Preliminary NTSB findings indicate broken rail caused coal-train derailment near Pueblo

Truck pinned under collapsed freeway bridge beneath derailment

PUEBLO, Colo. — A broken rail is believed to have caused the derailment of a BNSF coal train near Pueblo on Sunday that led to the death of a truck driver on Interstate 25, according to preliminary findings of the National Transportation Safety Board. The Colorado Sun news site reports NTSB investigators determined the broken […]

Read More…

New Jersey short line holds golden spike ceremony

Man speaking from caboose platform to crowd

FARMINGDALE, N.J. — The Delaware & Raritan River Railroad, a Chesapeake & Delaware subsidiary, celebrated the completion of its F&S Connection with a golden spike ceremony in Farmingdale on Oct. 13. The $12 million project extended D&RR’s Freehold Branch by 5 miles from Freehold to Farmingdale, where it joins D&RR’s Southern Branch. Interchange with Conrail, […]

Read More…

Canada’s High Frequency Rail project begins Request for Proposal phase

VIA_Map

OTTAWA — The Canadian government’s slow-moving process of developing its proposed High-Frequency Rail passenger route between Toronto and Quebec City is taking its next step. Transport Minister Pablo Rodriguez announced Friday the start of the Request for Proposals process for the rail project, with a deadline announced only as “summer 2024.” Those proposals will come […]

Read More…

Eight projects seek federal funding for South Dakota rail infrastructure improvements

Overgrown rail line with tank car visible in distance

PIERRE, S.D. — Eight railroads and government agencies have made their pitches to the South Dakota Railroad Board for more than $58 million available in infrastructure project funding from the Federal Railroad Administration. KELO-TV reports that the board is administering $58.9 million in Special Transportation Circumstances grants, part of $139 million in funding announced earlier […]

Read More…

Connecticut approves $1.1 billion in transportation bond funding

Amtrak high speed train meets Metro-North electric multiple-unit trainset

HARTFORD, Conn. — Connecticut has approved more than $1.1 billion in state bond funding for transportation projects, Gov. Ned Lamont has announced. Funds will help meet matching requirements for federal money available through the Bipartisan Infrastructure Law, which could help the state land more than $2.5 billion in federal funding. “The $1.1 billion in state […]

Read More…