Rehab My Railroad | Rehab Effort Recap, Episode 16

Work on the HO scale Milwaukee, Racine & Troy (MR&T) Jones Island project has come to a close, so it’s prime time for David Popp and Eric White to survey the 14 x 3-foot finished layout section! Follow along as the two hosts, along with Cody Grivno and Ben Lake, point out specific scenes and […]

Read More…

Rehab My Railroad: A study in structure construction, Episode 12

The full Rehab crew is on hand to help push progress on the Jones Island HO scale layout section a bit further along. Join David, Cody, Eric, and Ben, as they walk through what they’re working hard to complete on their respective structure and trackwork projects. […]

Read More…

Rehab My Railroad: Painting, prepping and pouring harbor water, Episode 11

Continental Grain Co. and other various structures on the MR&T.

David and Cody are back to the task of working along the Jones Island waterfront scene. Specifically, Cody starts the session by adding the seawall pieces and a temporary styrene wall to retain the poured resin water. While those installations dry, David pops back in to solder feeder wires to the yard tracks, all before […]

Read More…

Rehab My Railroad: Adding more details at Mukwonago, Episode 10

David Popp standing next to a section of the MR&T

More work along the Mukwonago layout location. The session starts with David installing trackwork for the industrial spur at this site, while Cody continues prepping the structure itself. Adding realistic details to the track, pavement, structure, and surrounding area is also part of the process in this episode of the Jones Island rehab effort.   […]

Read More…

Rehab My Railroad: Modifying existing benchwork, track, and scenery, Episode 9

David Popp and Cody Grivno migrate to the Mukwonago layout location and prepare the site for a relocated, rail-served industry. As David preps the property, including benchwork, track, and scenery modifications, Cody sprays a few coats of paint on the structure. All of this while Dana Kawala shows how to install and wire Rapido RailCrew […]

Read More…

Rehab My Railroad: Track, templates, and uncoupler wiring, Episode 8

Let’s say it all together now…it’s time for another episode of Rehab My Railroad: Jones Island! David and Cody have teamed up to take on more trackwork and test the space allotted for signature structures in the terminal. Plus, Dana works out the wiring for the Rapido RailCrew On-Off Uncoupler. […]

Read More…

Rehab My Railroad: Keeping on track, Episode 7

David and Cody have added new trackwork to the MR&T HO scale layout rehab project. But there’s trouble along the turnouts that has to be addressed! Eric White also pops in to show off his tugboat and share an update on the cement silo build. Cody is also on-site to showcase his efforts building harbor […]

Read More…

Rehab My Railroad: Adding a remote uncoupler, Episode 6

David launches into this episode with a speedy survey of the progress being made on the MR&T HO scale layout reno project. But his attention quickly shifts to finishing the cork roadbed and adding a Rapido RailCrew remote uncoupling unit along an industry track lead. While he’s at it, David also shows how to install […]

Read More…

Rehab My Railroad: Ready for roadbed, Episode 5

Before any of the trackwork can be added to the MR&T HO scale layout renovation project, David and Cody must first install the underlying roadbed. Follow along, as the two demonstrate some of their quick tips for working with cork roadbed products. Of course, they also have plenty of other insights to share about fascia […]

Read More…