Bill Neale’s PRR Panhandle Division in HO scale

Follow Model Railroader Editor Eric White on a journey into the thick of operations on the Pennsylvania Railroad’s Panhandle Division, as replicated on Bill Neale’s HO scale (1:87.1) model railroad! As feature in Great Model Railroads 2010, Bill’s 200-foot multi-level layout captures a vital stretch of mainline serving the coal and steel country of western Pennsylvania […]

Read More…

FRA issues an emergency order for SEPTA Silverliner IV equipment

Meet of electric multiple-unit commuter trains

WASHINGTON — SEPTA on Wednesday said it would not follow a National Transportation Safety Board recommendation that it pull fire-prone Silverliner IV cars from service. But hours later the Federal Railroad Administration issued an emergency order covering the electric multiple-unit equipment. It orders SEPTA to remove groups of the cars for emergency mechanical assessments. General […]

Read More…

East Troy Industrial Park Sidetrack | Building a glass plant, Part 5

In this Sidetrack Series departure from the HO scale (1:87.1) East Troy Industrial Park Project Railroad, you’ll learn how to use brass wire and flat bar to create durable, small-diameter brackets and tension wires for the scratchbuilt generator structures. Throughout the demo, Eric shows viewers how to use specialized tools, including wire nippers and metal-bending […]

Read More…

Trump administration freezes federal support for Hudson Tunnel, Second Avenue subway

Map showing amtrak construction in New York and New Jersery

WASHINGTON — The Trump administration is halting reimbursements on nearly $18 billion in federal commitments to two of New York City’s largest infrastructure projects — the Hudson Tunnel and the Second Avenue Subway expansion — pending a review of contracting practices. White House budget director Russell Vought said on Wednesday the move is tied to […]

Read More…

NTSB urges SEPTA to pull Silverliner IV cars from service, citing fire risk

Meet of electric multiple-unit commuter trains

WASHINGTON — The National Transportation Safety Board on Wednesday urged the Southeastern Pennsylvania Transportation Authority to remove its Silverliner IV coaches from service until the Philadelphia-area commuter agency can mitigate fire risk in the fleet. The NTSB concluded that the outdated design of the Silverliner IVs, in combination with SEPTA’s maintenance and operating practices, represents […]

Read More…

News photo: Metroliners live on

Cab car with blue and red front passing Amtrak "Windsor Locks station sign

Amtrak push-pull cab control coach No. 9646, in fresh “Phase VII” paint, stops at Windsor Lock, Conn., leading Springfield, Mass.-New Haven train No. 465 on September 28, 2025. Built as Pennsylvania Railroad Metroliner coach No. 813 in 1967, and converted to its current unpowered cab control car configuration during the 1980s, No. 9646 is among […]

Read More…

Brightline revamps schedules, pricing, and train length

View from bridge of white and yellow locomotive and passenger train

MIAMI — Beginning Oct. 6, Brightline is making sweeping changes that adjust schedules, capacity, and pricing to capture ridership and revenue for both its Miami-West Palm Beach and South Florida-Orlando clientele. Hourly round trips between Miami and Orlando will be reduced from the current 15 to 10, departing about every two hours, while short-distance frequencies […]

Read More…

Maintenance responsibilities shift for San Joaquins and Capitol Corridor (revised and updated)

Passenger train with "Fresno, Calif." station sign in foreground

Editor’s note: San Joaquin Joint Powers Authority Interim Director David Lipari provided additional information on Oct. 6, 2025, that corrects and expands upon information that was not available or mischaracterized in the original report. Updated Oct. 7 at 11.45 a.m. OAKLAND, Calif. — Transit America, a subsidiary of Herzog Transit Services, Inc., has been tapped […]

Read More…

East Troy Industrial Park, Ep. 24 | Road Markings & Terrain Painting

The initial segment of the HO scale (1:87.1) East Troy Industrial Park project layout edges closer to completion! In this episode, you’ll see how Cody Grivno and David Popp refine roadway detail and paint a touch of earth-tone color over the plaster covered terrain. Be sure to keep up with the construction progress by linking […]

Read More…

Amtrak, CN ask STB to extend filing deadline in contract case

Passenger train stops at station

WASHINGTON — Amtrak and Canadian National Railway have asked the Surface Transportation Board to extend the deadline for filings in their long-running dispute over an operating agreement, telling the board they are “actively engaged in discussions aimed at settling this complex and long-standing case.” In a joint filing on Friday, Sept. 26, the two sides […]

Read More…