Back on Track: Fixing a few helix flaws, Episode 7

Series host Gerry Leone is definitely playing catch up in this episode, as he works to patch up a minor oversight. Watch to see how he corrects and simplifies the helix construction, and then presents a clever suggestion for looking back in time when building a new home or layout. […]

Read More…

Back on Track: Painting & installing a backdrop, Episode 8

Bound and determined to build it better than his previous layout, Gerry walks through his evolved process for handling the installation of a hardboard backdrop. Plenty of neat tips and trick can be found in this and other episodes of Back on Track, an exclusive Trains.com series! […]

Read More…

Back on Track: Building benchwork and beginning stage of a helix, Episode 5

Even with a little help from a friend, host Gerry Leone still struggles with benchwork construction. But after setting joists straight and level, he jumps right into raising the grade along the helix. Discover a few new track tips and tricks along the way. […]

Read More…

Back on Track: Helix construction prep work, Episode 4

With design issues behind him, Gerry begins building the components of a four-turn helix. Even though math is involved in this stage, our host is up to the task. And he’s clever enough to use and share a number of helpful resources that make the process easy to understand and follow. […]

Read More…

HO scale Norfolk & Western of the 1950s

HOscaleNorfolkWestern

Name: The Norfolk & Western of the 1950s Layout owner: Gary Hoover Scale: HO (1:87.1) Size: 24 x 49 feet Prototype: Norfolk & Western Ry. Locale: Virginia and West Virginia Era: 1954 to 1957 Style: multi-level walk-in Mainline run: 120 feet Minimum radius: 30″ (N&W), 27″ (Virginian Ry.) Minimum turnout: no.8 (main), no. 6 (yards) […]

Read More…