East Troy Industrial Park, Ep. 14 | Painting the backdrop

Painting the initial backdrop installation a single shade of blue was just fine to get things started on the HO scale (1:87.1) East Troy Industrial Park project layout. However, David and Bryson share an easy technique for blending the background sky color with the adjacent wall color, and set the stage for those stunning photos […]

Read More…

News photo: Latest Metro-North heritage unit makes revenue debut

Silver and blue locomotive on commuter train

NEW YORK — Metro-North’s latest heritage unit, P32AC-DM No. 203, made its debut in commuter operation today (June 20, 2025), powering Hudson Line train No. 734, a 7:58 a.m. departure from Croton-Harmon to Grand Central Terminal. As has been the case with the debut of other heritage locomotives, No. 203 led the inbound train, rather […]

Read More…

Metra receives funding for two station projects, three locomotives

People on platform between two commuter trains

CHICAGO — Metra will receive more than $104 million in grants for station projects and the purchase of three electric switching locomotives, the commuter rail operator has announced. The funding will come from the Congestion Mitigation and Air Quality Improvement program of the Chicago Metropolitan Agency for Planning. The money will include $80 million for […]

Read More…

East Troy Railroad Museum’s Milwaukee Day scheduled for June 28

Orange trolly car on display in front of depot

EAST TROY, Wis. — The East Troy Railroad Museum’s Milwaukee Day, scheduled for June 28, will feature rare displays and trolley rides with equipment directly tied to the Brew City’s past. Three rarely-seen pieces in the museum’s collection are planned to be brought out of storage for display at the East Troy depot. Chicago North […]

Read More…

East Troy Industrial Park EXTRA | Progress Report #1

Now that trains are running on the HO scale East Troy Industrial Park (ETIP) project layout, David Popp hosts this BONUS video to share some of the behind-the-scenes efforts and design considerations the MR crew still needs to tackle. As so many model railroaders can attest, there’s no such thing as “finished” layout…especially when structure […]

Read More…

News photos: Metro-North unveils seventh heritage locomotive

Side view of the MTA Central locomotive

NORTH WHITE PLAINS, N.Y. — The Metro-North Railroad has unveiled the seventh unit in its heritage locomotive series and the first to be repainted, rather than wrapped. The scheme on MN P32AC-DM 203 replicates the image applied to seven Conrail FL9s in 1980 when New York’s Metropolitan Transportation Authority funded their rebuild by General Electric […]

Read More…

East Troy Industrial Park, Ep. 13 | DCC system installation

Even though track wiring is in place, our hosts still need to install a Digital Command Control (DCC) system before trains will run on the HO scale (1:87.1) East Troy Industrial Park project layout! David and Bryson first examine the components of the NCE PH5R Power Pro DCC system before working to integrate the parts […]

Read More…

East Troy Industrial Park, Ep. 12 | Wiring

David and Bryson can’t run trains on the HO scale (1:87.1) East Troy Industrial Park project layout without routing power to the rails! Follow along, as the hosts work to attach feeders to the rails and string a network of wiring underneath the model railroad. You won’t want to miss any of the insider tips […]

Read More…

Toy train parts suppliers

model train with screwdriver and assorted parts around it

One of the questions we receive quite regularly is where to find parts. Sooner or later, it’s likely you’ll need a part for your locomotive or rolling stock. It could be as simple as replacing traction tires or as complicated as a postwar rehab project. In either case, we’ve got you covered! For each retailer, […]

Read More…

East Troy Industrial Park, Ep. 11 | Laying curved track

Hosts David Popp and Bryson Sleppy take a swing at the curves! Specifically, the process required to install sections of flexible track around the arching mainline, sidings, and spurs on the HO scale (1:87.1) East Troy Industrial Park project layout. Follow their insightful instructions for making free-flowing, yet reliable trackwork on your next model railroad! […]

Read More…

East Troy Industrial Park, Ep. 10 | Laying straight track and turnouts

The HO scale (1:87.1) East Troy Industrial Park project layout wouldn’t be a model railroad without the trackwork! In this episode, hosts David Popp and Bryson Sleppy work to install sections of flexible straight track, before demonstrating how to add standard turnouts (track switches) along the line. Be sure to keep up with the construction […]

Read More…