STUART, Fla. — Brightline and the Florida East Coast Railway have launched a schedule app and website for the St. Lucie River drawbridge, offering mariners real-time information on bridge operations. The bridge began operating under a new schedule on Aug. 15 under a new “temporary deviation” announced by the U.S. Coast Guard [see “Coast Guard […]
Read More…
WASHINGTON — For the second time in a month, Brightline West has filed “Expedited Action Requested” documents with the Surface Transportation Board, seeking approval of the company’s plans for building a 186-mph electrified rail line between Las Vegas, Nev., and Southern California. On Tuesday, Aug. 15, Brightline West urged the STB to rule favorably on […]
Read More…
STUART, Fla. — The U.S. Coast Guard has issued new rules for a Florida East Coast Railway drawbridge, removing a requirement to open the bridge for up to 15 minutes twice each daylight hour and striking a compromise between boating and rail traffic. The change is crucial for the planned start of Brightline passenger service […]
Read More…
STUART, Fla. — The U.S. Coast Guard plans to issue revised rules governing the Florida East Coast Railway drawbridge over the St. Lucie River in Stuart on Friday, Aug. 11, WQCS Radio reports — but details on those revisions are not yet public. Operating rules for the bridge are a key concern for Brightline as […]
Read More…
ORLANDO — Brightline is no longer selling tickets for Sept. 1-14 trips between West Palm Beach and Orlando, but that doesn’t necessarily mean the first day of revenue service will be Sept. 15. Responding to a Trains News Wire inquiry, Brightline issued the following statement late today (Monday, Aug. 7): “We’re working through the final […]
Read More…
MELBOURNE, Fla. — Brightline testing at speeds up to 110 mph will move into the Melbourne area as soon as this Friday, July 28, as the passenger operator continues preparations to launch service between Orlando and South Florida later this summer. Testing will take place on approximately 41 miles of track and include a total […]
Read More…
WASHINGTON — The Federal Railroad Administration last week provided environmental clearance for a Southern California section of the proposed Brightline West high speed rail line to Las Vegas, Nev., moving the project closer to construction. The Las Vegas Review-Journal reports the FRA determined there would be no significant environmental impacts for the 49-mile extension from […]
Read More…
ORLANDO, Fla. — Brightline will resume 110 mph on two sections of its route to Orlando this week, including the segment in Martin County that includes St. Lucie River bridge that has become a point of concern for the passenger operator’s service plans. Testing at speeds up to 110 mph is scheduled to resume in […]
Read More…
LONDON — Virgin Group employees claimed the corporation was facing a “brand catastrophe” and “a reputation nightmare” according to emails introduced by Brightline in a lawsuit over its split with Virgin over the branding of the U.S. rail passenger service, the Financial Times reports. A trial began Monday in London over Brightline’s exit from its […]
Read More…
ORLANDO, Fla. — With a display of civic support from mayors along its route, Brightline has celebrated completion of construction on its route to Orlando, as well as the contribution its employees have made in forging a unique passenger rail operation. The event today (Wednesday, June 21) at Brightline’s Orlando International Airport station comes as […]
Read More…
STUART, Fla. — Brightline high speed testing in Florida’s Martin County, which had been scheduled for later this week, has been postponed, the passenger operator said today (Tuesday, June 20). Testing had been scheduled for Wednesday, June 21, through Friday, June 23, at speeds up to 110 mph through a series of grade crossings, as […]
Read More…
ORLANDO, Fla. — Brightline will resume testing at speeds up to 110 mph in Martin County, Fla., Wednesday through Friday of this week, June 21-23 — testing that will also impact the St. Lucie River drawbridge in Stuart, Fla. It had initially been scheduled to being today (Monday, June 19). Testing is scheduled for 6 […]
Read More…