BOSTON — Work to repair track that was built out-of-gauge on the Green Line extension that opened last year will not be completed by Monday, Dec. 11, as originally projected, the Massachusetts Bay Transportation Authority has announced. Project builder GLX Constructors, or GLXC, which requested additional repair time, has been granted an additional seven nights, […]
Read More…
BALTIMORE — The Maryland Transit Administration is halting service on its light rail line in Baltimore because of mechanical issues requiring immediate repairs, officials said at a Thursday press conference. The service suspension is effective today (Friday, Dec. 8) and will be in effect indefinitely. The Baltimore Sun reports that MTA Administrator Holly Arnold said […]
Read More…
WASHINGTON — The National Transportation Safety Board is calling for backup cameras on maintenance-of-way machinery, as well as other safety recommendations, as a result of a fatal accident involving a Norfolk Southern track gang at Reed, Pa., in December 2021. The NTSB issued its final report on that accident on Thursday (Dec. 7). The probable […]
Read More…
WASHINGTON — Construction of a new Long Bridge across the Potomac River will be the largest beneficiary of a $729 million grant for Virginia rail projects announced today by members of the state’s congressional delegation, the latest in a series of major awards nationally under the Federal-State Partnership for Intercity Passsenger Rail grant program. U.S. […]
Read More…
Facts & features Name: Freemont MillsScale: HO (1:87.1)Size: 3′-51⁄2″ x 7′-103⁄4″Prototype: freelancedLocale: Eastern U.S.Era: 1970Style: Free-Mo moduleMainline run: 94″Minimum radius: 60″Minimum turnout: No. 6Maximum grade: noneBenchwork: open gridHeight: 50″Roadbed: corkTrack: Walthers code 83Backdrop: noneControl: Train Control Systems LT-50 Download this trackplan! Buy the January 2023 issue of Model Railroader! […]
Read More…
Facts & features Name: Reading Co. Scale: HO (1:87.1)Size: 13′-6″ x 22′-0″ plus 2′-6″ x 5′-3″ West Philadelphia additionPrototype: Reading Co.Locale: eastern PennsylvaniaEra: 1930s to 1940sStyle: walk-inMainline run: 80 feetMinimum radius: 36″ (main)Minimum turnout: No. 6 (main), No. 4 (yards and industries)Maximum grade: 2%Benchwork: modified L-girderHeight: 50″ to 58″Roadbed: cork on plywood (main), Homasote on […]
Read More…
Facts & features Name: Conway Scenic RRScale: N (1:160)Size: 6 x 12 feetPrototype: freelancedLocale: New Hampshire’s White Mountain regionEra: modernStyle: islandMainline run: 45 feetMinimum radius: 36″Minimum turnout: No. 8Maximum grade: 3.5%Benchwork: open gridHeight: 36″Roadbed: CorkTrack: Peco code 80 flextrackScenery: extruded-foam insulation boardBackdrop: painted on wallsControl: SCADA automation system Download this trackplan! Buy the […]
Read More…
WASHINGTON — Infrastructure improvements to accommodate a second daily round trip of Amtrak’s Pennsylvanian between Pittsburgh and Harrisburg, Pa., will receive more than $143 million in federal funding, the state’s two U.S. senators have announced, while the Pittsburgh-Philadelphia corridor is among those selected for the Corridor Identification and Development program for a study of increased […]
Read More…
BOSTON — The Massachusetts Bay Transportation Authority has eliminated 12 speed restrictions on the rapid-transit Green Line following nine days of maintenance that began Nov. 27 and concluded on Tuesday, Dec. 5, the agency announced Wednesday. The total of 12 restrictions eliminated is two more than had been planned. Another two restrictions were reduced in […]
Read More…
NEWINGTON, Conn. — Planned service cuts for Connecticut’s Shore Line East commuter service, which have been delayed during an Amtrak maintenance project, will take effect Dec. 18, the Connecticut Department of Transportation has announced. Previously, Shore Line East service had included 23 trains per day; under the new schedule it will see 16 trains per […]
Read More…
WASHINGTON — Seven routes in North Carolina and four serving Ohio are among those to receive funding to study possible future Amtrak service under the Federal Railroad Administration’s Corridor Identification and Development Program, according to announcements today (Tuesday, Dec. 5) by members of Congress, as well as one mayor. At least 14 corridors have been […]
Read More…
MORRISTOWN, N.J. — NJ Transit’s Morris & Essex Line is facing modified operations for an unknown period as a result of extensive catenary repairs near Mount Tabor, N.J., the transit agency reports. As of this morning (Tuesday, Dec. 5), and continuing until further notice, three eastbound trains and four westbound trains are cancelled each day; […]
Read More…