MARC, VRE begin cross-honoring passes

Commuter train with two engines and bilevel coaches

BALTIMORE — While through-running operation for MARC and Virginia Railway Express trains beyond Washington, D.C., remains a wish-list items for some passengers and both agencies, the two commuter rail operators are now making it a little easier and less expensive for some riders to make use of both services. A new agreement, announced Thursday and […]

Read More…

EBT 0-6-0 No. 3 leaves Pennsylvania for new home in Alabama

Steam locomotive moving on highway on goose-neck truck trailer.

MOUNT UNION, Pa. —  East Broad Top Railroad’s last remaining standard-gauge 0-6-0 switcher, a 1923 Baldwin Locomotive Works engine, on Wednesday left the only place it has called home for 101 years aboard a specialized heavy-haul low-boy trailer. The 68-ton locomotive is destined for display at a park in Red Bay, Ala., more than 800 […]

Read More…

Lehigh Valley NRHS to host Alco Seminar

Alco locomotives on bridge

NORTHAMPTON, Pa. — The Lehigh Valley Chapter of the National Railway Historical Society/Railroad Historians of the Lehigh Valley are hosting an “Alco Seminar” on Saturday, Sept. 21, at the Northampton Event Center. The event will feature speakers who had a hand in the design and operation of Alcos, officials from railroads with Alco power, and […]

Read More…

Genesee Valley Transportation sells two Alcos to heritage railway

Black and yellow locomotive switching at business

BATAVIA, N.Y. — Genesee Valley Transportation has sold two Alco RS3 locomotives to heritage railway Saratoga Corinth & Hudson, the two operations announced today (Aug. 2). Locomotives No. 4103 and 4118, which wore the same numbers with the Delaware & Hudson, were purchased from the Octoraro Railroad and rebuilt at Genesee Valley’s South Scranton Shop. […]

Read More…

Amtrak seeking $300 million in grants for NEC work in New Jersey

Aerial view of rail bridge across other rail lines

WASHINGTON — Amtrak has applied for almost $300 million in federal grants to address infrastructure needs on the Northeast Corridor, including problems with the catenary system that have led to significant delays in recent months, NJ.com reports. The passenger company is seeking $299.7 million through four Federal Railroad Administration CRISI (Consolidated Rail Infrastructure and Safety […]

Read More…

B&O 2-8-0 on a short line

20180809

The Castleman River Railroad ran 13 miles from Bittinger, Md., to a connection with the Baltimore & Ohio at Worth, Pa. The road’s lone engine, a Consolidation leased from the B&O, rests at Grantsville, Md., while men unload a boxcar in September 1955. Philip R. Hastings photo […]

Read More…

MBTA continues progress on track improvements with Red Line project

Maintenance crew working in tunnels of transit system

BOSTON — The Massachusetts Bay Transportation Authority’s latest extended maintenance shutdown led to the elimination of nine speed restrictions — two more than originally planned — on the rapid-transit Red Line, the MBTA said on Tuesday. The work was conducted between Alewife and Kendall/MIT July 12 and 15-26; from Alewife to JFK/UMass July 13-14 and […]

Read More…

Dirty kitty

20190703

Covered in coal dust, Chessie System GP40-2 No. 4156 and a mate in Baltimore & Ohio blue lead a coal train onto the Old Main Line at Point of Rocks, Md., in 1983. Michael S. Murray photo […]

Read More…