Series host Steve Brown heads for the homestretch, as he works to complete the scenery on his down-sized (N scale) depiction of the Winston-Salem Southbound Railway. Follow the “Regular Guy” routine to learn simple ways for adding both fine and clump ground cover materials to the outlots of this industrial area. […]
Read More…
After a quick update with Jenny to see how her Walther’s bungalow kit is coming along, David gets to work on electrical projects. Follow along, and you’ll see how he installed feeder wires and added a power bus line under the State Line Route N scale layout. […]
Read More…
After more than a year of filming episodes in his basement and in the MR workshop, Cody Grivno is back in the office! In this episode, he will take a look at an Atlas N scale 48-foot coil car, an Athearn Genesis HO scale Electro-Motive Division GP15-1 road diesel, and the Locomotive 2021 annual from […]
Read More…
In this episode, David’s projects include repairing benchwork, installing a bridge, and laying curved track sections. Tune in for David’s tips and techniques for making flowing, smooth curves with Micro Engineering Flex-Track. […]
Read More…
Hal and Rene are on location at the Burlington Garden Center in Burlington, Wisconsin. In this episode, they showcase the garden center’s railway display, show you tips on weathering a structure, and update you on Cody’s diesel locomotive project! […]
Read More…
Cody Grivno is back in the studio for the latest episode of Cody’s Office, and today he’s taking a look at a Rapido Trains HO scale 37-foot meat refrigerator car, an Athearn HO scale EMD GP60 diesel locomotive, and a new book called Building the Right Size Layout by Thomas Klimoski (available at the Kalmbach Hobby […]
Read More…
After sanding the cork roadbed, David is ready to lay track on the State Line Route N scale layout. His tip: start with the most complex piece of track, which, in this case, is in the train yard! Plus, David checks in with Rene and Jenny to see how their structures for the layout are […]
Read More…
In this episode, host Gerry Leone gets back to the backdrop. Namely, he’s working to disguise those unpreventable seams that appear between sections of hardboard panels. Gerry shares his techniques for getting the job done in a satisfactory way, but without the painstaking efforts of a professional drywall installer! […]
Read More…
It’s hard to keep with Gerry’s rapid pace of construction. Fortunately, he slowed down for a quick recap of what he’s accomplished with the cameras turned off. Then, it’s back to solving benchwork problems! […]
Read More…
Host Gerry Leone continues to plan and build out a switching area for his all-new Bona Vista HO scale model railroad. This time, Gerry shares how he uses actual model structures and track remnants to visualize and plot his plans, and then adjust them to suit layout realities. […]
Read More…
In this episode, Host Steve Brown has more trackwork to revamp. This time he’s working to insert a new crossover turnout configuration (a pair of track switches) into a yard lead. Learn why and how he did it…the “Regular Guy” way! […]
Read More…
Recent changes to Steve Brown’s N scale layout had an impact on operations. As such, he must carefully remove trackwork for re-use. Follow along Steve’s “Regular Guy” techniques for extracting and restoring various sections of track. […]
Read More…