California governor signs LOSSAN Corridor legislation

Cab car leads passenger train along track next to ocean

SACRAMENTO, Calif. — California’s governor has signed legislation giving the state more authority in managing the LOSSAN Rail Corridor, the route of Amtrak’s Pacific Surfliner between San Diego and San Luis Obispo, as well as Metrolink and Coaster commuter trains. SB 1098, sponsored by state Sen. Catherine Blakespear (D-Encinitas), allows the state’s secretary of transportation […]

Read More…

FRA finalizes $3 billion Brightline West grant

Illustration of high speed train in desert

WASHINGTON — The Federal Railroad Administration has officially signed the $3 billion grant agreement for the Brightline West rail project, the company has announced. The grant, awarded to the Nevada Department of Transportation, was signed today (Sept. 26). The grant award was announced in December 2023 [see “Legislators say Brightline West will receive $3 billion […]

Read More…

California’s Tehachapi Loop

Steam locomotive with passenger train on broad curve

When it comes to showmanship in mainline mountain railroading, California’s Tehachapi Pass can be described as a grand theater. Located between Bakersfield and Mojave, historic Tehachapi Loop is at center stage, an impressive helix stretching three-quarters of a mile while looping over itself to gain 77 feet in elevation. The loop itself sits at about […]

Read More…

Alstom lawsuit challenges waivers approved by FRA for Brightline West’s trainset order: Analysis

Shell for passenger train car under construction inside factory

WASHINGTON — Its offer rejected in a years-long competitive bidding process, an Alstom lawsuit challenges waivers for the construction of new Brightline West equipment. The Federal Railroad Administration approved waivers of the “100% Buy America” provisions granted to winning bidder Siemens. Brightline West selected Siemens over Alstom to build 186-mph Las Vegas-Southern California trainsets by […]

Read More…

Los Angeles light rail project gains $893 million in federal funding

Illustration of light rail train running in street

WASHINGTON — The Federal Transit Administration on Friday signed a $893.3 million grant agreement for LA Metro’s planned light rail line in the San Fernando Valley. The 6.7-mile, $3.57 billion East San Fernando Valley Light Rail project will largely follow Van Nuys Boulevard, and connect the bus rapid transit Orange Line to two Metrolink lines, […]

Read More…

The HO scale South Durham Railway layout

A model railroad track plan for the south durham railroad, with two figures seen from above standing in an around-the-walls layout

Facts and features Name: South Durham Ry.Scale: HO (1:87.1)Size: 9’-6″ x 11’-0″Prototype: freelancedLocale: North CarolinaEra: 1970sStyle: around the wallsMainline run: 22 feetMinimum radius: 22″Minimum turnout: No. 4Maximum grade: none (flat)Benchwork: shelf Height: 57″Roadbed: cork on HomasoteTrack: code 83 extrackScenery: tabletopBackdrop: photo backdrop from Backdrop JunctionControl: Lenz DCC   Click the link to download a PDF […]

Read More…

Port of LA plans $52 million on-dock rail upgrade

Aerial view of on-dock rail facilities at port

LOS ANGELES — The U.S. container port arms race is moving by rail. The Los Angeles Harbor Commission on Thursday said it has approved a lease amendment that finalizes plans for $52 million to improve the on-dock rail capacity at the Port of Los Angeles Pier 300. Pier 300, the second-largest terminal at Los Angeles, […]

Read More…

‘Rail to Trail’

20190930

A stagecoach, steam locomotive, and F7 in Southern Pacific’s “black widow” paint scheme gather at a “Rail to Trail” pageant in Sacramento, Calif., celebrating the 100th anniversary of SP’s earliest predecessor, the Sacramento Valley Railroad, which began operation in 1856. Southern Pacific photo […]

Read More…