Misaligned switch led to LIRR derailment, MTA says

Derailed electric multiple unit trainset

NEW YORK — A misaligned switch — incorrectly shown to dispatchers as being correctly aligned for a straight-ahead move — was the cause of last week’s derailment of a Long Island Rail Road train at Hall Interlocking in Queens, the Metropolitan Transportation Authority said today (Aug. 11). Thirteen people were injured, two seriously, in the […]

Read More…

Class I railroads have yet to join Close Call Reporting System

Logo for Federal Railroad Administration

WASHINGTON — In the wake of the East Palestine derailment, U.S. Class I railroads pledged to join the Federal Railroad Administration’s Confidential Close Call Reporting System, which allows employees to report near accidents and other safety violations. But the New York Times reports that five months later, the railroads have not yet done so and […]

Read More…

MBTA plans 58-day disruption of commuter rail Haverhill Line

Portion of commuter rail system map showing MBTA Lowell and Haverhill lines

BOSTON — The Massachusetts Bay Transportation Authority will halt service most of on its Haverhill commuter rail line for 58 days beginning Saturday, Sept. 9, to accommodate signal system upgrades related to Automatic Train Control upgrades to positive train control. Trains will be diverted from the Haverhill Line to the Lowell Line south of Ballardvale […]

Read More…

Derailment closes Switzerland’s Gotthard Base Tunnel (updated)

Passenger train exits tunnel and rounds curve

Rail operations in Switzerland have been disrupted by a derailment in the Gotthard Base Tunnel, the world’s longest rail tunnel. The English-language Swiss news site TheLocal.ch reports the derailment involving a freight occurred about noon Thursday at the Faido multifunction station, one of two locations within the 35.5-mile-long tunnel including emergency-stop facilities and ventilation equipment. […]

Read More…

CP No. 2816 continues break-in runs

View from cab of steam locomotive

CALGARY — Canadian Pacific No. 2816 has now been run for about 700 miles since returning to operation, CPKC’s Jonathan J. Morris, manager, operating practices-steam, says in a post on the locomotive’s Facebook page, and is “running like the wind.” The locomotive was returned to steam June 18 and made its first short run June […]

Read More…

Federal judge orders BNSF and coal producer to arbitrate dispute

Full and empty coal trains stopped on adjacent tracks

Navajo Transitional Energy Co.’s lawsuit against BNSF Railway, which seeks damages for the railway’s alleged failure to reach coal volume commitments, must head to arbitration, a federal judge ruled this week. NTEC filed suit against BNSF in December, claiming that the railroad’s preferential treatment of other mines cost it more than $150 million in revenue […]

Read More…

New rules coming for Stuart, Fla., rail drawbridge

Freight train with two locomotives and LNG tender crossing bridge

STUART, Fla. — The U.S. Coast Guard plans to issue revised rules governing the Florida East Coast Railway drawbridge over the St. Lucie River in Stuart on Friday, Aug. 11, WQCS Radio reports — but details on those revisions are not yet public. Operating rules for the bridge are a key concern for Brightline as […]

Read More…

FRA report: Norfolk Southern safety improving, but gaps remain

Aerial view of burning freight cars

WASHINGTON — Norfolk Southern’s commitment to safety has improved since the disastrous Feb. 3 hazardous materials derailment in East Palestine, Ohio, the Federal Railroad Administration said in a report released today. But the FRA’s 143-page supplemental safety culture assessment also found that NS often focuses on meeting minimum safety standards, has inadequate communications procedures, inconsistent […]

Read More…